Mauritius Island, Port Louis
Located in the northern zone of the harbor at Port Louis, the Mauritius Container Terminal (MCT) is 560 meters long with a dredge depth of 14 meters and a turning circle of 450 meters. To stabilize the platform that will hold a container park with a maximum 7 container stacking height, the use of geosynthetic for separation and reinforcement was proposed.
The solution chosen is a geocomposite TenCate ROCK PEC55/55 made of PET yarns knitted on a PP nonwoven geotextile. This solution optimizes the sub-base hardcore as well as the overall performance of the platform and lead to reduce the 400mm thick sub-base layer to a 250mm.
Download case study description