A cost effective Solution with TenCate Polyfelt® PGM 14
TenCate Polyfelt® PGM-G guarantees safe landing at the Mediterranean Coast
Glass-fibre Composite PGM G used for Rehabilitation of Runways
TenCate Polyfelt® PGM G 100/100 turned out to be the most cost-effective and technically sound solution, providing increase in lifetime.
Construction of a new asphalt overlay above old concrete surface
Awaza, located at Turkmenbashi, is going to become the touristic attraction point of Asia. Massive construction works in the city lead to shortage of energy.
The historic Tua railway follows one of Douro’s tributaries, Tua river. Due to the construction of a large dam downstream, a solution must be found to protect the existing platform from instability created by new hydraulic conditions.
The Kama is one of Russia’s biggest rivers. Due to the high flow speed and significant changes in the water level during the year, the problem of bank erosion is omnipresent.
To build a new refinery unit at the site of an oil refinery in Antwerp, a temporary road had to be constructed. Specific problems had to be solved due to the size 27m long, 20m high and the weight 1.400 tons of the element .
Commissioned by the Department of Waterways and Public Works, the A15 between the Maasvlakte and the Vaanplein interchange is widened. The aim was to reduce the number of traffic jams and ensure that the surrounding area is safer and remains accessible.